You are here:
Blyth Estuary Draft Strategy

A handout detailing the Blyth Estuary draft strategy is now available following this link. Drop in sessions were held on Friday 28th and Saturday 29th September.

If you have any comments then please contact the team, link to "Contact Us" page

We have undertaken a Strategic Environmental Assessment (SEA) of our draft strategy. The Non Technical Summary of our SEA Environmental Report and the full Environment Report are available through the links below. Due to the large file size of the Environmental Report we have split this up into a number of parts.

Non Technical Summary (640 KB)

SEA Environmental Report:
Part 1 (1.5 MB)
Part 2 (6 MB)
Part 3 (3.5 MB)
Part 4 (4.5 MB)
Part 5 (5 MB)
Appendices (11 MB)

Hard copies of these reports are also available to view at the libraries at Southwold and Halesworth and at our Eastern Area Office, Cobham Road, Ipswich. The consultation period for the draft strategy will run from 28th September 2007 to the 29th February 2008.

The following supporting technical documents are now available to view.
Technical Report (15 MB)
Economics Report (3.1 MB)
Costing Report (350 KB)

Hard copies of these technical reports are available to view at our Eastern Area Office, Cobham Road, Ipswich.